Summary

  • Objective:
    • To address the current water demand on the Southern Water Supply Project
    • To reduce the volume of non-revenue water
    • To improve the quality of water distributed
  • Project Description:
    • Installation of 1.890km of 150mm Ductile Iron pipes.
    • Installation of 0.100km of 100mm Flanged Ductile iron pipes
    • Installation of 0.510km of 100mm Ductile Iron pipes
    • Installation of 3 Fire Hydrants
    • Construction of valves chambers, stud columns, thrust blocks and associated concrete works
    • Installation of Pressure Reducing Valves (PRV)
    • Asphalt road reinstatement 2km X 0.600m wide.

     

  • Project Deliverables:

    A total of 2.5km of ductile iron pipes were installed under this project.

  • Project Duration: Project commenced in March 2012 and was completed in August 2012.

Latest News

NAWASA Blog
Applications are invited from suitably qualified persons to fill the position of Assistant Finance Manager at the National Water and Sewerag...
NAWASA Blog
Twenty-nine (29) years ago the Grenada Chamber of Industry and Commerce decided that it needed to celebrate local businesses that have exce...
NAWASA Blog
It was a wonderful week of activities at the 26th Annual Caribbean Water and Waste Water Association’s Conference and Exhibition in Guyana ...
JoomShaper