Summary

  • Objective:
    • To address the current water demand on the Southern Water Supply Project
    • To reduce the volume of non-revenue water
    • To improve the quality of water distributed
  • Project Description:
    • Installation of 1.890km of 150mm Ductile Iron pipes.
    • Installation of 0.100km of 100mm Flanged Ductile iron pipes
    • Installation of 0.510km of 100mm Ductile Iron pipes
    • Installation of 3 Fire Hydrants
    • Construction of valves chambers, stud columns, thrust blocks and associated concrete works
    • Installation of Pressure Reducing Valves (PRV)
    • Asphalt road reinstatement 2km X 0.600m wide.

     

  • Project Deliverables:

    A total of 2.5km of ductile iron pipes were installed under this project.

  • Project Duration: Project commenced in March 2012 and was completed in August 2012.