×

Warning

JUser: :_load: Unable to load user with ID: 227

Summary

  • Objective:
    • Reduce the threat of system failure
    • To replace the Old capsule
  • Scope:
    • Installation of two submersible pumps
    • Relocation of sewer and pump mains
    • Installation of valves and fitting
  • Project Duration: Project commenced in March 2013 and was completed in May 2013
  • Funding: NAWASA

JoomShaper