Summary

  • Objective:

    To reduce/eliminate the occurrence of turbid water distributed from plant

  • Scope:
    • Installation of online turbidimeter
    • Installation of automatic valve system
    • Installation of a chemical dosing/regulating system
    • Control and automatic read-out system
  • Beneficiary:
    • NAWASA (better operating systems, longer filter runs)
    • Customers (Quality water supply)
  • Project Duration: Project commenced in August 2013 and was completed in September 2013
  • Funding: NAWASA - $50,000