Grand Anse Sewer Lift Station #3
Summary
-
Objective:
- To reduce the risk of flooding at lift station
- To improve the efficiency of the equipment
-
Scope:
- Installation of duplex submersible pumping system
- Isolation of pumping system through the use of pumps and piping systems
- Replace corroded piping system with PVC
-
Project Deliverables:
New piping and pumping system