G-CREWS Climate Resilient Water Sector Project

What the project involves

The Climate-Resilient Water Sector in Grenada, or G-CREWS, is strengthening Grenada’s water system so that it can cope better with drought, intense rainfall, hurricanes and other climate-related pressures. The programme combines improvements to water governance and conservation with major investments in NAWASA’s infrastructure, including new water-storage tanks, pipeline works, the Seven Sisters Water Transfer Project and modern monitoring technology.

For NAWASA, the infrastructure programme includes eight new water-storage tanks at strategic locations and extensive pipeline works to move water more effectively between production, storage and distribution areas. By December 2025, four of the eight tanks were still under construction, while tanks and associated pipelines had been developed in areas including St. Mark, Mirabeau, Peggy’s Whim, Morne Rouge, Chantilly and Carriacou.

The investment goes beyond pipes and tanks. Under G-CREWS, NAWASA has introduced a Supervisory Control and Data Acquisition, or SCADA, system at the Annandale Water Treatment Plant, Grand Etang Pumping Station and Old Fort Tank. The system continuously monitors water levels, flows, pressure and water-quality parameters and allows staff to respond more quickly to faults or abnormal operating conditions. A Site Acceptance Test was completed in April 2026, together with practical training for NAWASA operators.

Why it is needed

Grenada’s water supply is particularly exposed to climate change because the country depends heavily on surface water and rainwater catchment. Higher average temperatures, increasingly unpredictable rainfall, intense rain events that raise turbidity in raw water, and saltwater intrusion into coastal groundwater all place additional pressure on freshwater supplies and treatment systems. G-CREWS was designed to address those risks by increasing water availability while reducing demand and strengthening the management of the water sector.

The challenge is already evident in communities that experience dry-season shortages. In southeastern Grenada, for example, the Les Avocate and Petite Etang systems serve approximately 11,400 people and experience water deficits during the dry season. The Seven Sisters Water Transfer Project is intended to supplement these systems through a new intake and pump station at Great River and a transfer pipeline through the Grand Etang Forest Reserve.

Additional storage is just as important. Larger storage reserves give NAWASA more flexibility when rainfall is low, production is disrupted or extreme weather affects normal operations. On Carriacou, two new 100,000-imperial-gallon tanks at Mt. Royal and Belair were commissioned in late September 2026, increasing the island’s capacity to hold water for droughts, hurricanes and other disruptions.

What customers can expect while it is underway

Residents near active G-CREWS work sites may experience temporary construction impacts while pipelines, tanks and associated facilities are completed. The project’s Environmental and Social Management Plan is intended to minimise impacts on communities and the environment, and G-CREWS and NAWASA have been conducting community visits to explain works, answer questions and provide information on how concerns can be reported.

Customers can use the project’s Grievance Redress Mechanism to raise concerns connected to construction, including dust, noise and site-safety issues. Complaints are formally documented and addressed as part of the project’s environmental and social safeguards.

As the infrastructure is brought into service, customers should benefit from stronger storage and distribution capacity and a water system that is better equipped to operate during dry periods and emergencies. The new SCADA system also gives NAWASA operators real-time information on critical parts of the network, improving the utility’s ability to detect unusual conditions, respond to faults and manage water quality.

PROJECT FACTS

Status

In progress

Parish

Communities served

Start date

December 2019

Expected completion

January 2027

Funding source

Green Climate Fund; German Federal Government through the International Climate Initiative; Government of Grenada.

Contractor

Updates

3 Oct 2026

A major milestone was reached in Carriacou with the commissioning of G-CREWS-supported water assets, including two 100,000-imperial-gallon storage tanks at Mt. Royal and Belair. The works expand water-storage capacity on the sister isle and are intended to improve resilience during droughts, hurricanes and other climate-related disruptions. Water cisterns were also completed at the Windward Medical Station and L’Esterre Medical Centre to strengthen continuity of water supply at these health facilities.

15 Jul 2026

A new SCADA system became a major operational milestone under G-CREWS. The system links the Annandale Water Treatment Plant, Grand Etang Pumping Station and Old Fort Tank, giving operators real-time visibility of water levels, flow, pressure and water-quality conditions. The three pilot sites collectively serve systems covering approximately 36,120 people, including important residential, commercial and tourism areas.

9 Dec 2025

Continued progress on the programme’s main infrastructure package. The remaining four of eight new storage tanks are under construction alongside pipeline installation works. Community engagements are taking place in St. Mark, St. Andrew, St. Patrick, St. George and Carriacou to keep residents informed about construction and the project’s grievance process.

1 Dec 2025

Work on the Seven Sisters Water Transfer Project is progressing as an intervention to address dry-season shortages affecting the Les Avocate and Petite Etang systems in southeastern Grenada. The project involves a Great River intake and pump station and a transfer pipeline designed to supplement systems serving about 11,400 people.

Gallery

Related projects

Laura Water Treatment Plant Project Update

The Laura Water Treatment Plant had reached approximately 85% completion. Final commissioning is the next major activity.

UKCIF Southern St. George Water Supply Expansion Project

Road reinstatement remains a key part of the UKCIF works as sections affected by pipeline installation are restored.