Laura Water Treatment Plant Project Update

What the project involves

NAWASA is upgrading the water and wastewater network serving St. George’s and the southern corridor. The work includes improvements to the Concord Water Treatment Plant, associated transmission piping and storage, as well as the laying or upgrading of approximately 14 kilometres of water mains and 2 kilometres of sewer mains. The project will also install valves, flow meters and other equipment and will connect the Concord and Annandale supply networks so that water can be moved more reliably into Southern St. George.

The wider programme also includes improvements to wastewater infrastructure from St. George’s into Southern St. George and measures to strengthen monitoring, reduce water losses and make the water system more resilient to changing climate conditions.

Why it is needed

The project is intended to improve year-round access to potable water for customers supplied by the Annandale Water Supply System, particularly in Southern St. George. By linking Annandale with the Concord system, upgrading major mains and treatment infrastructure, and reducing losses from the network, NAWASA will have greater flexibility to move water where it is needed and strengthen the reliability of supply in the south.

The project also addresses wastewater needs in St. George’s and the southern corridor. It is a major expansion of both water and wastewater systems.

What customers can expect while it is underway

Residents, businesses and motorists in active work areas may notice excavation, temporary traffic controls, dust and changes to normal road access while pipelines are installed and roads are reinstated.

Traffic arrangements may change as work moves from one section to another.

PROJECT FACTS

Status

Completed

Parish

St David

Communities served

Richmond Hill, Marian, Morne Jaloux and surrounding communities

Start date

November 24, 2023

Expected completion

February 2026

Funding source

NAWASA capital works/CAPEX programme

Contractor

Farray’s Construction Services Limited.

Updates

26 Jan 2026

The Laura Water Treatment Plant had reached approximately 85% completion. Final commissioning is the next major activity.

18 Sep 2025

Connection works were undertaken between the Les Avocat Dam and the new Laura Water Treatment Plant.

6 Sep 2024

Construction of the Laura Water Treatment Plant is approximately 70% complete.

28 Aug 2024

The plant is approximately 60% complete, with work progressing despite minor setbacks.

24 Nov 2023

Preparations started to begin construction of the Laura Lands Water Treatment Plant at Laura Lands, St. David.

8 Nov 2023

An expression of interest was published for associated 6-inch pipeline works connected with the Laura Lands Water Treatment Plant, forming part of the infrastructure required to connect the facility to the water supply system.

2 Aug 2023

The construction award for the Laura Lands Water Treatment Plant was published. Farray’s Construction Services Limited is the contractor.

Gallery

Related projects

G-CREWS Climate Resilient Water Sector Project

A major milestone was reached in Carriacou with the commissioning of G-CREWS-supported water assets, including two 100,000-imperial-gallon storage tanks at Mt. Royal and Belair. The works expand water-storage capacity on the sister isle and are intended to improve resilience during droughts, hurricanes and other climate-related disruptions. Water cisterns were also completed at the Windward Medical Station and L’Esterre Medical Centre to strengthen continuity of water supply at these health facilities.

UKCIF Southern St. George Water Supply Expansion Project

Road reinstatement remains a key part of the UKCIF works as sections affected by pipeline installation are restored.